ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes

Product Details
Customization: Available
After-sales Service: Online Technical Support
Warranty: 2
Still deciding? Get samples of US$ 1/Piece
Request Sample
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
20000000 RMB
Terms of Payment
LC, T/T
International Commercial Terms(Incoterms)
FOB, CFR, CIF, EXW
  • ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes
  • ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes
  • ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes
  • ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes
  • ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes
  • ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Company Profile
  • Packaging & Shipping
Overview

Basic Info.

Model NO.
fire fighting pipe
Technique
ERW
Material
Carbon Steel
Surface Treatment
Galvanized
Usage
Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Construction & Decoration
Section Shape
Round
Payment
LC, T/T
Delivery Time
15-30days After Deposite
Outside Diameter
21.3-273mm
Length
5.8-12m
Transport Package
PVC Packing
Specification
Thickness: 1.2-12mm Outer Diameter: 4in-12in
Trademark
no
Origin
China
Production Capacity
10000t/Months

Product Description

Product Description

Product Name Carbon seamless steel pipe
Size ERW OD 1/2 Inch -26 inch
SSAW OD 219mm-2540mm
LSAW OD 457.2mm-1422.2mm
Seamless OD 21.3MM-710MM
ERW Thickness 1mm-18mm
SSAW Thickness 5.4mm-25.4mm
LSAW Thickness 7.92mm-50.8mm
Seamless Thickness 3-45mm
Lengths 3-20M
Steel Material GR. B X42 X46 X52 X56 X60 X65 X70 X80, etc
Standard API 5L PLS 1 & PLS 2, A53,A106,A333,A671,A179,A192,A210,EN10217,EN10219,EN10224,JIS G3444 ETC
Usage Oil Pipe, Casing Tube, Line Pipe and Fluid (Water, Gas) Transmission, Boiler Pipe
Surface Bared Black Painting, Anti-Corrosion Coating,Galvanized etc
Proctor Plastic cap
Package Bundles, Bulk,sea worthy wooden case packing or pr your requirement
Inspection With Hydraulic Testing, Ultrasonic testing or X-ray Test
Certificate API and ISO9001; 2000
Date of Delivery Less Than 15/20/25/30/40/50/60 Days According To The Quantity
Payment:  L/C or T/T
Port of Shipment Tianjin, China

Detailed Photos

ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes
ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes
ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes
ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes

ASTM A795 Standard Steel Pipe Red Fire Fighting PipesASTM A795 Standard Steel Pipe Red Fire Fighting PipesASTM A795 Standard Steel Pipe Red Fire Fighting Pipes

Company Profile

Tianjin Jinxinbao Mental Surface Treatment Co.,LTD .We were founded in 2012, with the headquarters location at the largest welded pipe production based in china-Yangjiayuan Town,Tianjin city,which is the most professional manufactuer of galvanized steel products in this area. There have total 6 galvanized production lines ,about 200 employees and annual production more than 200000 tons .
As the export's window, Tianjin Shengteng Internatinal Trading Co.,LTD , manily exporting the factory's galvanized steel products, especially galvanized steel pipe ,square and rectangular steel tube, seamless steel pipe,ERW steel pipe, galvanizeds teel coil/sheets ,scaffolding steel props, PV mounting system .

Quality inspection
ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes

Packaging & Shipping

ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes
ASTM A795 Standard Steel Pipe Red Fire Fighting Pipes

FAQ

1)How manys days can you delivery after confriming order ?
If we have stock ,we can shipping within 5-7 days . If customized ,usually within 30 days with normal size . Specially sizes need to confirm with factory.

2) What is your payment?
1. 30%TT deposit, 70% balance against with BL copy . 
2. 100% LC at sight /45 days or 60 days LC 

3)What is the product's warranty ?
As long as you received our cargo within 1 years, you have any problem ,pls feedback to us .After cnofirming our quality cause ,we will resend new pipes or give reasonable compensation for you.

4) Can I have a trail order ?
Of course ,we are gald to make a trail order to show our quality and service . Getting your satification ,we can try more cooperation .

5) Can I have a vist ?
 Welcome your visiting ,we can communicate and exchange market information to develop more business.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier