Product name:
Malaysia Frame 2.3mm H Frame Steel Scaffolding Yellow DIP Painted Masom
Ladder Frame Scaffolding Speed Lock Steel Frame Scaffold for Construction
Scaffolding Frame |
Model NO. |
Specification (H*W) |
Weight |
E-Frame Scaffolding
(Door-type frame) |
1930*1219 mm |
12.5/13.5 kg |
1700*1219 mm |
12.5/13 kg |
1700*914 mm |
10.8 kg |
1524*1219 mm |
11 kg |
H Frame Scaffolding
(Ladder-type frame) |
1930*1219mm |
14.65/16.83kg |
1700*1219 mm |
14/14.5 kg |
1524*1524 mm |
13-14 kg |
1219*1219 mm |
10 kg |
914*1219 mm |
7.5 kg |
Cross Brace Description: |
Item No. |
AXBXC |
Reference Weight |
JSCW-001 |
1219x1524x1952mm(21.3x1.5mm) |
2.9kg |
JSCW-002 |
1219x1219x1724mm(21.3x1.5mm) |
2.5kg |
JSCW-003 |
1219x1829x2198mm(21.3x1.5mm) |
3.2kg |
JSCW-004 |
610x1219x1363mm(21.3x1.5mm) |
2.0kg |
JSCW-005 |
610x1219x1928mm(21.3x1.5mm) |
2.8kg |
JSCW-006 |
914x1829x2045mm(21.3x1.5mm) |
3.0kg |
JSCW-007 |
610x1219x1524mm(21.3x1.5mm) |
2.3kg |
FAQ
1)How manys days can you delivery after confirmed the order?
From stock ,we can shipping within 5-7 days.
For customized of common size, will be delivery in 30 days.
and for specially sizes need to negotiate.
2) What's your payment?
1. 30%TT as deposit, 70% balance against the copy of BL.
2. 100% LC at sight /45 days or 60 days LC
3)What's the product's warranty ?
As long as you received our cargo within 1 years, if you have any problem, pls feedback to us.
After confirmed our quality cause, we will resend new pipes or give reasonable compensation for you.
4) Can I have a trail order ?
Of course, we are gald to make a trail order to show our quality and service.
Getting your satification, we can try more cooperation .
5) Can I have a vist ?
Welcome your visiting ,we can communicate and exchange market information to develop more business.
6)
Can you supply other scaffolding materials ?
Yes. All related construction materials.
(1) Scaffolding system
(cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) Scaffolding steel pipes
(3) Steel coupler (pressed/drop forged coupler)
(4) Steel plank with hooks or without hooks
(5) Steel stair case
(6) Screw adjustable base jack
(7) Construction Metal Formwork
QUALITY CONTROL
1)Before Shipping ,Our professional Inspectors Will Check
The Pipe's Diameter,Thickness,Length, Chemical Composition, Mechanical Properties,Zinc Coating etc,
Everything is Ok,
Then Will Shipping and Supply a MTC With Full Information .
2) Support The Third Party Inspection ,SGS, BV and Others.
Tianjin Jinxinbao Mental Surface Treatment Co.,LTD. (Headquarters) Founded in 2012
Tianjin Baojing New Energy Technology Co.,LTD. Founded in 2016
Tianjin Shengteng Internatinal Trading Co.,LTD. Founded in 2018
with the location at the largest welded pipe production based in china-Yangjiayuan Town,Tianjin.
Which is the most professional manufactuer of steel products in this area.
We have total 6 galvanized production lines,
and about 200 employees, annual production more than 200000 tons.
RECOMMEND HOT SALE
Pre-galvanized Steel pipe tube
Hot dip galvanized Steel pipe tube
Black steel pipe tube
ERW steel pipe tube
Scaffolding prop
Scaffolding Frame
Steel plank
Galvanized steel coil
If you have another question, pls feel free to contact us as below
CONTACT DETAILS:
Kevin_Ji Overseas Dept. Manager
Tianjin Shengteng International Trading Co.,Ltd
Tianjin Jinxinbao Metal Surface Treatment Co.,Ltd
Tianjin Baojing New Energy Technology Co.,Ltd
Office: Bishuiyuan Plaza No.15-102, Jinghai District, Tianjin, China
Factory: High-grade Products Industrial Park No.8, Jinghai Economic-Technological Development Area