• Construction Plywood H20 LVL Wood I-Beam 0497
  • Construction Plywood H20 LVL Wood I-Beam 0497
  • Construction Plywood H20 LVL Wood I-Beam 0497
  • Construction Plywood H20 LVL Wood I-Beam 0497
  • Construction Plywood H20 LVL Wood I-Beam 0497

Construction Plywood H20 LVL Wood I-Beam 0497

Material: Timber
Type: Mobile
Structural Style: Multi-Pole Scaffolding
Framework: Combined Scaffolding
Supporting Mode: Floor Type Scaffolding
Lapping Form: Single Row Scaffolding
Customization:
Diamond Member Since 2018

Suppliers with verified business licenses

  • Overview
  • Product Description
Overview

Basic Info.

Model NO.
2.9, 3.9,
Erection Position
External Scaffolding
Move Method
Integral Lifting Scaffolding
Scaffolding Part Type
Scaffolding Props
Construction Properties
Installation Scaffold
Transport Package
Machine Standard
Specification
2.9, 3.9,
Trademark
shengteng
Origin
China

Product Description

 

Product Description

 

Product Description

Formwork H20 Timber Beam, also called H20 Wood beam, I Joist, I beam, Wood H beam or Wood Girder, is widely used in formwork systems, construction systems parts, Falsework, systems, timber structures and other bearing structures .
Raw Material
New Zealand Radiate Pine LVL ,Solid Pine/Spruce,Poplar LVL,Plywood,3 ply board.
Flange
200/160mm(height)*80mm(width)*40mm(flange thickness)
Length
1.90, 2.45, 2.75, 2.90, 3.00, 3.30, 3.60, 3.90, 4.50, 4.90, 5.90 m, up to 12m ( any special length on clients' requent)
Standard
EN13377:2002 & DIN V 20000-2 standard
Moisture Content
<12%
Density
4.7-5.5kg/m
End finish
red plastic wrap,waterproof paint,Metal cap.
Surface finish
yellow painting,waterproof
Usages
slab formwork system,vertical formwork(wall,column,hydraulic climbing,etc.),
adjustable arced formwork etc. etc
Packing
Pallets on the bottom,and Steel band for strength



Product Description

Product Description                                                                                                                                                                                                        Construction Plywood H20 LVL Wood I-Beam 0497

Construction H20 Timber Beam

 

 

 

Construction Plywood H20 LVL Wood I-Beam 0497

Introduction

Timber beam is an important part of formwork system, and has a very wide range of application in engineering.

  Construction Plywood H20 LVL Wood I-Beam 0497

Construction Plywood H20 LVL Wood I-Beam 0497Construction Plywood H20 LVL Wood I-Beam 0497
Standard Specifications
Construction Plywood H20 LVL Wood I-Beam 0497

End-to-end-joint

According to the need, standard holes can be drilled in the two ends of timber beam. We can lengthen the timber beam by end-to-end join. According to customers' demand, we can produce timer beams with any length.

Construction Plywood H20 LVL Wood I-Beam 0497

Parameters

 

PARAMETERS
Model timber beam H20
Width   8 cm
Height  20 cm
Length 900mm~5900mm
Flange 40*80mm
Web 26mm
Shear Capacity (broken loading) 24KN
Bending Bearing Moment 11KN.M

 

 

 

 

 Raw Material

 Raw material is spruce wood improted from Fenland.
Construction Plywood H20 LVL Wood I-Beam 0497

Carpentry Workshop
Construction Plywood H20 LVL Wood I-Beam 0497
Construction Plywood H20 LVL Wood I-Beam 0497

Packing and Shipment
Construction Plywood H20 LVL Wood I-Beam 0497

 For 20' feet container: maximum loading capacity is 2260m

 For 40' (GP) feet container: maximum loading capacity is 4600m

 For 40' (HQ) feet container: maximum loading capacity is 5000m


FAQ                                                                                                                                                                                                               
Construction Plywood H20 LVL Wood I-Beam 0497

Q1. What do you do?

A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

 

Q2. How many construction projects have you accomplished?

A: 600 both in China and abroad.

 

Q3. Have you accomplished any landmark?

A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing the Nest Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.

 

Q4. What can you do for us?

A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.

B.We sell our products to the contractors, building companies, or trading companies

C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.

D.We provide remote or on-site instruction to the builders.

 

Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?

A: Structural drawing and section drawing.

 

Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?

A: In general, it takes 5~7 days based on specific requirements of construction project.

 

Q7. How long dose it take to manufacture the products after the signing of contract?

A: In general, it takes 30~60 days based on the type and quantity of products to be produced.

 

Q8. Are your products available for leasing?

A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now