Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Connection Form: | Pipe Section Connection |
Still deciding? Get samples of US$ 30/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Type
|
H frame scaffolding system & A frame scaffolding
|
|||
Variety
|
Walk through type & Ladder type
|
|||
Main components
|
frame, catwalk, joint pin, cross brace, base jack, u-head jack and caster
|
|||
Advantage
|
easy erection, strong loading capacity, safety and stability
|
|||
Size
|
1219*1930/1219*1700/1219*1524/914*1700/1219*1219/1219*914/914*914/762*1700
|
|||
Usage
|
bridge, tunnel, petrifaction, shipbuilding, railway, airport, dock industry, civil building, etc.
|
The H frame scaffolding system consists of several key components that work together to create a robust and functional structure:
H Frames: These are the primary structural elements of the system, resembling the letter "H" when viewed from the side. They are typically made from high-strength aluminum or steel and come in various sizes to accommodate different heights and widths.
Ledgers: These horizontal tubes connect the vertical legs of the H frames, providing additional stability and preventing lateral movement.
Braces: Diagonal braces are used to reinforce the frames, enhancing overall stability and preventing collapse under heavy loads.
Decking: This refers to the platforms or planks that are laid across the ledgers to create a working surface. Decking materials can include wood, aluminum, or specialized scaffolding boards.
Stabilizers: These are additional support structures used to anchor the scaffolding to the ground or building, ensuring that the system remains upright and secure.
Accessories: Other accessories such as guardrails, toe boards, and stairways are essential for ensuring worker safety and compliance with regulations.
The H frame scaffolding system offers several advantages over other types of scaffolding:
Ease of Assembly: The modular design of H frame scaffolding allows for quick and easy assembly and disassembly, reducing setup times and minimizing labor costs.
Versatility: The system can be configured in various ways to suit different project requirements. It can be used for both internal and external work, making it suitable for a wide range of applications.
Strength and Stability: The H shape of the frames provides exceptional stability, even at significant heights. This makes the system ideal for projects where a high degree of safety is paramount.
Durability: H frame scaffolding is typically constructed from high-quality materials such as aluminum or steel, ensuring that it can withstand harsh weather conditions and heavy usage over time.
Cost-Effective: Due to its modular design and ease of assembly, H frame scaffolding can be more cost-effective than other scaffolding solutions. It requires fewer components and less time to set up, leading to reduced overall costs.
1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .
2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).
3. Q: What's your payment terms?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.
4. Q: What's your delivery time?
A: 15-28 days after received the advance payment .
5. Q: Are you manufacturer or trader?
A: We are production and trade integration of construction materials for 19 years.
6. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.
7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.
(1) Scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) Scaffolding steel pipes
(4) Steel coupler (pressed/drop forged coupler)
(5) Steel plank with hooks or without hooks
(6) Steel stair case
(7) Screw adjustable base jack
(8) Construction Metal Formwork