Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe

Product Details
Customization: Available
After-sales Service: Online Technical Support
Warranty: 2
Still deciding? Get samples of US$ 1/Piece
Request Sample
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
20000000 RMB
Terms of Payment
LC, T/T
International Commercial Terms(Incoterms)
FOB, CFR, CIF, EXW
  • Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe
  • Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe
  • Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe
  • Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe
  • Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe
  • Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Company Profile
  • Packaging & Shipping
Overview

Basic Info.

Model NO.
fire fighting pipe
Type
Seamless
Technique
ERW
Material
Carbon Steel
Surface Treatment
Galvanized
Usage
Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Construction & Decoration
Section Shape
Round
Payment
LC, T/T
Delivery Time
15-30days After Deposite
Outside Diameter
21.3-273mm
Length
5.8-12m
Transport Package
PVC Packing
Specification
Thickness: 1.2-12mm Outer Diameter: 4in-12in
Trademark
no
Origin
China
Production Capacity
10000t/Months

Product Description

Product Description

Product Name Carbon seamless steel pipe
Size ERW OD 1/2 Inch -26 inch
SSAW OD 219mm-2540mm
LSAW OD 457.2mm-1422.2mm
Seamless OD 21.3MM-710MM
ERW Thickness 1mm-18mm
SSAW Thickness 5.4mm-25.4mm
LSAW Thickness 7.92mm-50.8mm
Seamless Thickness 3-45mm
Lengths 3-20M
Steel Material GR. B X42 X46 X52 X56 X60 X65 X70 X80, etc
Standard API 5L PLS 1 & PLS 2, A53,A106,A333,A671,A179,A192,A210,EN10217,EN10219,EN10224,JIS G3444 ETC
Usage Oil Pipe, Casing Tube, Line Pipe and Fluid (Water, Gas) Transmission, Boiler Pipe
Surface Bared Black Painting, Anti-Corrosion Coating,Galvanized etc
Proctor Plastic cap
Package Bundles, Bulk,sea worthy wooden case packing or pr your requirement
Inspection With Hydraulic Testing, Ultrasonic testing or X-ray Test
Certificate API and ISO9001; 2000
Date of Delivery Less Than 15/20/25/30/40/50/60 Days According To The Quantity
Payment:  L/C or T/T
Port of Shipment Tianjin, China

Detailed Photos

Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe
Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe
Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe
Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe

Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated PipeStandard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated PipeStandard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe

Company Profile

Tianjin Jinxinbao Mental Surface Treatment Co.,LTD .We were founded in 2012, with the headquarters location at the largest welded pipe production based in china-Yangjiayuan Town,Tianjin city,which is the most professional manufactuer of galvanized steel products in this area. There have total 6 galvanized production lines ,about 200 employees and annual production more than 200000 tons .
As the export's window, Tianjin Shengteng Internatinal Trading Co.,LTD , manily exporting the factory's galvanized steel products, especially galvanized steel pipe ,square and rectangular steel tube, seamless steel pipe,ERW steel pipe, galvanizeds teel coil/sheets ,scaffolding steel props, PV mounting system .

Quality inspection
Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe

Packaging & Shipping

Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe
Standard Fire Fighting ASTM Black and Hot Dipped Zinc-Coated Pipe

FAQ

1)How manys days can you delivery after confriming order ?
If we have stock ,we can shipping within 5-7 days . If customized ,usually within 30 days with normal size . Specially sizes need to confirm with factory.

2) What is your payment?
1. 30%TT deposit, 70% balance against with BL copy . 
2. 100% LC at sight /45 days or 60 days LC 

3)What is the product's warranty ?
As long as you received our cargo within 1 years, you have any problem ,pls feedback to us .After cnofirming our quality cause ,we will resend new pipes or give reasonable compensation for you.

4) Can I have a trail order ?
Of course ,we are gald to make a trail order to show our quality and service . Getting your satification ,we can try more cooperation .

5) Can I have a vist ?
 Welcome your visiting ,we can communicate and exchange market information to develop more business.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier