BS1139 Drop Forged Scaffolding Swivel Clamp Couplers for Structure

Product Details
Customization: Available
Material: Steel
Type: Pressed, Drop Forged
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
20000000 RMB
Terms of Payment
LC, T/T
International Commercial Terms(Incoterms)
FOB, CFR, CIF, EXW
  • BS1139 Drop Forged Scaffolding Swivel Clamp Couplers for Structure
  • BS1139 Drop Forged Scaffolding Swivel Clamp Couplers for Structure
  • BS1139 Drop Forged Scaffolding Swivel Clamp Couplers for Structure
  • BS1139 Drop Forged Scaffolding Swivel Clamp Couplers for Structure
  • BS1139 Drop Forged Scaffolding Swivel Clamp Couplers for Structure
  • BS1139 Drop Forged Scaffolding Swivel Clamp Couplers for Structure
Find Similar Products

Basic Info.

Scaffolding Part Type
Scaffolding Couplers
Construction Properties
Building Scaffold
Surface
Electro-Galvanized, HDG
Transport Package
Packing in Woven Bags or Carton
Specification
48.3mm, 48.6mm
Origin
China
Production Capacity
10000 Piece/Pieces Per Month

Product Description

Product Information 

BS1139 Drop Forged Scaffolding Swivel Clamp Couplers for Structure
1. Pressed scaffolding clamp
Item Product Name Type Thickness Outer Diameter U.W PC of 20'GP
1 Double Coupler Pressed 4.75mm 48.3mm 0.82kg 25000
2 Swivel Coupler Pressed 4.5*4.75mm 48.3mm 0.99 23500
3 Sleeve Coupler Pressed 3.5mm 48.3mm 1.0kg 20736
4 Inner Joint Pin Pressed 4.5mm 48.3mm 0.7kg 35000
5 Half Coupler Pressed 4.75mm 48.3mm 0.45 49000
6 Board Retaining Pressed 4.75mm 48.3mm 0.56kg 35000
7 Putlog Coupler Pressed 4.75mm 48.3mm 0.57kg 35000
2. Drop forged scaffolding clamp
Item Product Name Type Thickness Outer Diameter U.W PC of 20'GP
1 Double Coupler Drop Forged   48.3mm 1.0-0.98kg 24000
2 Swivel Coupler Drop Forged   48.3mm 1.12kg 21000
3 Sleeve Coupler Drop Forged 3.5mm 48.3mm 0.98--1.0kg 21000
4 Inner Joint Pin Drop Forged   48.3mm 1.05kg 24000
5 Board Retaining Drop Forged 4.75mm 48.3mm 0.61kg 35000
6 Girder Coupler Drop Forged 11.5mm 48.3mm 1.52 15000
7 Putlog Coupler Drop Forged 4.75mm 48.3mm 0.61kg 35000

Product Show 

BS1139 Drop Forged Scaffolding Swivel Clamp Couplers for StructureBS1139 Drop Forged Scaffolding Swivel Clamp Couplers for StructureBS1139 Drop Forged Scaffolding Swivel Clamp Couplers for Structure
Product Feature 

BS1139 Drop Forged Scaffolding Swivel Clamp Couplers for Structure 
Quality Inspection 

BS1139 Drop Forged Scaffolding Swivel Clamp Couplers for Structure
Product Application

BS1139 Drop Forged Scaffolding Swivel Clamp Couplers for Structure
Packing & Transportation

BS1139 Drop Forged Scaffolding Swivel Clamp Couplers for Structure
About Us 

Tianjin Jinxinbao Metal Surface Treatment Co.,LTD .We were founded in 2012, with the headquarters
location at the largestwelded pipe production based in china-Yangjiayuan Town,Tianjin city,which is the
most professional manufactuer of galvanizedsteel products in this area. There have total 6 galvanized
production lines ,about 200 employees and annual productionmore than 200000 tons .


In the 2016, in order to meet client requirements, we built a after-processing factory, whose named is
Tianjin Baojing NewEnergy Technology Co.,LTD , which produced all kinds of customized products and
sucessful supplyfor many PV projects .


As the export's window, Tianjin Shengteng International Trading Co.,LTD , manily exporting the factory's
galvanized steel products, especially galvanized steel  pipe ,square and rectangular steel tube, seamless
steel pipe,ERW steel pipe, galvanized steel coil/sheets ,scaffolding steel props, PV mounting system .


In the past ,we get good feedback from old clients, and we will more fouce on the quality and improve the
service to thankful each client in the future.


FAQ

Q:What is your payment?
A:1.30%TT deposit, 70% balance against with BL copy . 
   2.100% LC at sight /45 days or 60 days LC 

Q:What payment methods your company accept?
A:We accept T/T, L/C, Western Union.

Q:How do you make our business long-term and good relationship?
A:1.We keep good quality and competitive price to ensure our customers benefit ;
   2.We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.


Q:Can we visit your factory?
A:Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow
up your case.


Q:How about the product test?
A:Based on the pipe standard, the pipes will be tested by hydrostatic test , X-ray inspection and full body UT
test , after manufacture and heat treatment.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now